HEDGEHOG POWER & DATA CENTER
CLIENT Confidential
SIZE 438 acres
COMPLETION Ongoing
TEXAS
R&R was selected, in partnership with Strata, to support a 438-acre Texas site planned for a data center campus with land planning and conceptual civil engineering.
R&R will evaluate developable acreage by identifying usable land outside floodplain and wetland constraints. Strata will provide yield analysis and a site plan to optimize the site layout. Using the preferred plan, R&R will develop concept roadway and utility infrastructure, preliminary grading, and an initial utility capacity assessment.

